YUL1 · Québec, Canada

Montreal Data Center (YUL1)

Hydroelectric-powered Tier III data center in Montreal - low PUE, direct on-ramps to every major cloud, and a Québec data-residency story.

Bitwrx YUL1 Montreal facility exterior with the Canadian flag flying

YUL1 runs on Québec hydroelectric power year-round. Cool ambient temperatures push PUE below 1.20 for ten months of the year. Purpose-built for regulated workloads requiring Québec residency, and AI training where electricity cost dominates.

At a glance

31MWTotal Capacity
1.18Annual PUE
100%Hydro Powered
60+Carriers Onsite

Facility specifications

Tier III certified. SOC 2 Type II, ISO 27001, PCI-DSS attested.

TierIII (concurrently maintainable)
Power5 MW total, 100% hydro, 2N UPS
CoolingFree cooling 8 months/yr, PUE 1.18
DensityUp to 40 kW/rack (DLC available)
SecurityMantrap + biometric
CertificationsSOC 2 Type II, ISO 27001
ComplianceQuébec Law 25 ready
Connectivity60+ carriers, direct cloud on-ramps

Connectivity

Carrier-neutral by policy. Cross-connects provisioned in < 48 hours.

  • 60+ carriers on-net
  • QIX peering fabric
  • Bell, Rogers, Telus, Cogeco
  • AWS Direct Connect available
  • Azure ExpressRoute available
  • Cross-border to NYC, Boston

Visit the facility

By appointment only. Reach out and we'll schedule a tour.

Unit 202, 6375 Dixie Rd, Mississauga, Ontario L5T 2E7

Schedule a tour →

Montreal - Québec, Canada

Need power in Montreal?

Tell us what you're deploying - typical turnaround under 24 hours.